FHP Property Consultants have announced that practical completion for Phase 3 Securiparc, Alfreton will be reached in March 2020. There are 3 new build industrial units available on a leasehold basis. All units are made of steel portal frame construction and will be completed to an excellent specification with 7m eaves.
Phase 3 Securiparc is situated on Wimsey Way in Alfreton on a secure and fenced site which has excellent access to the A38 dual carriageway and onwards to Junction 28 of the M1. Individual units are available from 125m² (1,347ft²) and can be combined to meet larger size requirements.
Anthony Barrowcliffe of FHP comments:
“I have had great success historically on Phase 1 and Phase 2 of Securiparc, therefore I am delighted to have been instructed to deal with Phase 3. In a market where small new build industrial units are hard to come by, I am thrilled to be offering these units to the market. The specification has been done to a superb standard and allows enough height for the installation of a mezzanine floor if required as well as a good yard and parking allocations.”